HomeAbout UsQualificationsServicesService LocationsFeatured ProjectsLinksCareersContact - Request for Proposal
Information Downloads 
Connect 
   

Phase III Projects (Site Remediation)

Phase III, commonly known as remediation investigations/feasibility studies, would be performed when previous ESA’s positively identified the presence of contaminated material on the subject property.  Once it has been confirmed that the site has been impacted by contaminants, Terra-Petra would employ various  remediation methods appropriate to site conditions/requirements. 

These methods would include:

  • Underground Storage Tank Removal (UST), as well as Above Ground Storage Tank Removal.
  • Soil Vapor Extraction/Dual-Phase Extraction
  • Air-Sparging – (“In Situ” Remediation Technology)
  • Skimmer-Pump Systems
  • Dig-and-Haul
  • Establish and implement remediation plan with approval of governing agencies (local, state, and federal)
  • Document project progress in conjunction with agency approval
  • Other Approved Suitable Remedial Methods to Meet Site Conditions/Requirements

Contact us for a Phase III proposal today.

Example of a soil vapor extraction (sve) unit at dry cleaner site.
THE METHANE EXPERTS!
 
Terra-Petra Environmental Engineering
415 W. Foothill Blvd, Suite 301 Claremont, California 91711
Now Serving all of North America
Toll Free: 1.888.540.5703 | Local Los Angeles area: 213.458.0494


           


©Copyright 2010 Terra-Petra, All Rights Reserved.
Site Design and management by Laurie Pehar Borsh PR